SYSTEM STATISTICS - FOR 29/04/2025 ,Tuesday

Ambient temperature at Kochi at 15 hrs in deg C  -  32

GENERATION - HYDEL

Station

Day's Generation

Monthly Cum

Daily Avg.

Maximum Demand

Shutdown

Availability of m/c's

 

mu

mu

mu

MW

Time

Planned

Forced

Avble

MP

EP

Idukki

6.123

197.905

6.8243

726

22

6

2

6

Sabarigiri

5.245

88.5575

3.0537

275

1

5

3

5

Idamalayar

0.8418

26.4201

0.911

57.4

19

2

1

2

Sholayar

0.9995

26.3171

0.9075

54.6

3

3

3

Pallivasal

0.361

0.0124

4

2

Group I Total

14.0193

354.7107

12.2314

Kuttiadi

1.3013

36.093

1.2446

190.4

22

1

5

5

Panniar

0.3321

7.7752

0.2681

31.8

21

2

2

GroupII Total

1.6334

43.8682

1.5127

Neriamangalam

0.5508

13.3433

0.4601

59.4

1

1

3

2

Lower Periyar

0.583

14.287

0.4927

116

22

1

2

2

Poringalkuthu, PLBE

0.2268

7.48

0.2579

42.54

21

6

5

Sengulam

0.5527

9.471

0.3266

51.2

21

4

4

Kakkad

0.6987

12.6566

0.4364

36.26

17

2

1

2

Kallada

0.2027

5.4103

0.1866

11

5

2

2

2

Malankara

0.0996

2.7014

0.0932

4.8

1

2

2

2

Sum: Small Hydels

0.3035

10.5733

0.3646

Group III Total

3.2476

77.1109

2.659

CAPTIVE

Maniyar

0.9947

0.0343

3

Kuthungal

0.1618

5.4782

0.1889

10

16

3

2

2

Hydel Total

19.0621

482.1627

16.6263

THERMAL

THERMAL BDPP

3

KDPP

1

Thermal Total

0

0

0

WIND

WIND Kanjikode

0.0015

0.34

0.0117

IPP

SOLAR KSEBL

0.0399

1.0835

0.0374

IPPs

1.4759

42.2976

1.4585

HYDEL(Contd..) Thottiyar

0.0298

1.188

0.041

1

1

1

PES-Pallivasal

0.81

15.15

0.5224

2

1

2

IPP Kayamkulam

Sum: Small Hydels

0.2113

3.6516

0.1259

MPS Steel+PCBL

0.1863

6.3787

0.22

Sum: Wind mills

0.115

5.3355

0.184

IPP Total

1.9884

57.6634

1.9884

Internal Generation

21.092

541.2496

18.6638

IMPORT 400KV MDKA

9.754

259.41

8.9452

400KV PKKD

8.014

244.642

771

50.06

400KV KOCHI+KOTTAYAM

15.729

444.057

15.3123

4169

50.04

400KV KOZHKOD

15.8

460.554

1688

50.03

400KV NORTH TRSR

6.5214

182.2861

6.2857

4725

50

400KV TVM

9.026

289.074

840

49.99

220KV_KNPA+SBGR +PVUD+EDMN

7.5857

310.1356

10.6943

3559

49.99

110KV_MJSM +PRSLA

0.6243

21.6525

Net Import

73.0543

2211.8112

76.2694

Consumption

94.1463

2753.0608

94.9331

497

50.04

Deviation Account

3484

50.02

Import (mu)

0.734

18.468

0.6368

310

50.25

Export (mu)

0.78

25.251

0.8707

3288

49.99

Avg Import Rate (Rs/kWh)

Avg Export Rate (Rs/kWh)

50.25

0.52

Import amount (Rs lakhs)

49.96

0.83

Export Amount (Rslakhs)

50.04

Net Import (on UI) (mu)

-0.046

-6.783

-0.2339

Net amount payable (Rs lakhs)

3629

223

210

CGS AVAILABILITY

36.0051

1068.5782

36.8475

50.04

224

212

Adl Share(-) / surrender(+)

4.2153

94.7701

3.2679

6

227

214

other open acess(+exp)

-0.5652

-15.0867

-0.5202

418

399

SR / ER Loss

1.1671

34.944

1.205

4768

223

215

Interstate Purch/Sale(+/-ve)

41.9531

1319.566

45.5023

49.99

224

217

Net Schedule

73.1411

2222.3315

76.6321

22

224

216

R E C O R D S

229

222

For the month

102.8818

3938

22

5139

24

4712.4957

229

222

All time

115.9485

4515

3

5797

2

5110.5708

223

218

Cumulative figures in mu

For the month

541.2496

2753.0608

105.51

2222.3315

-10.5203

For the Financial Year

541.2496

2753.0608

105.51

2222.3315

-10.5203