SYSTEM STATISTICS - FOR 24/04/2024 ,Wednesday

Ambient temperature at Kochi at 15 hrs in deg C  -  34

GENERATION - HYDEL

Station

Day's Generation

Monthly Cum

Daily Avg.

Maximum Demand

Shutdown

Availability of m/c's

 

mu

mu

mu

MW

Time

Planned

Forced

Avble

MP

EP

Idukki

6.356

160.405

6.6835

616

23

1

5

2

5

Sabarigiri

4.3731

115.8272

4.8261

302

1

6

2

6

Idamalayar

0.7755

23.3521

0.973

55.6

17

2

1

1

Sholayar

0.721

18.3208

0.7634

54.4

3

2

3

Pallivasal

0.4864

11.5261

0.4803

20.4

3

2

4

4

4

Group I Total

12.712

329.4312

13.7263

Kuttiadi

1.7969

38.9329

1.6222

193.2

1

5

5

Panniar

0.2377

8.9068

0.3711

30.4

2

2

GroupII Total

2.0346

47.8397

1.9933

Neriamangalam

0.3037

9.0539

0.3772

24.4

19

1

1

2

2

Lower Periyar

0.541

11.916

0.4965

156

22

3

3

Poringalkuthu, PLBE

0.3677

8.7267

0.3636

50.88

22

6

1

6

Sengulam

0.338

7.4554

0.3106

51.2

22

4

4

Kakkad

0.6205

15.9097

0.6629

35.96

4

2

1

2

Kallada

0.163

4.226

0.1761

11

19

2

1

2

Malankara

0.0765

2.0429

0.0851

4.8

23

2

2

2

Sum: Small Hydels

0.1606

4.0306

0.1679

Group III Total

2.5709

63.3612

2.64

CAPTIVE

Maniyar

1.4882

0.062

3

Kuthungal

0.2141

4.9219

0.2051

14.2

9

3

2

2

Hydel Total

17.5316

447.0421

18.6268

THERMAL

THERMAL BDPP

3

KDPP

0.104

0.43

0.0179

26

19

1

5

Thermal Total

0.104

0.43

0.0179

WIND

WIND Kanjikode

0.0016

0.0606

0.0025

IPP

SOLAR KSEBL

0.0576

1.275

0.0531

IPPs

1.4427

33.572

1.3988

IPP Kayamkulam

BSES

KPCL

Sum: Small Hydels

0.1372

3.6901

0.1538

MPS Steel+PCBL

0.2427

5.7884

0.2412

Sum: Wind mills

0.1329

4.0458

0.1686

IPP Total

1.9556

47.0963

1.9623

Internal Generation

19.6505

495.904

20.6627

IMPORT 400KV MDKA

12.834

304.51

12.6879

400KV PKKD

10.382

230.446

929

50.07

400KV KOCHI+KOTTAYAM

18.612

438.512

18.2713

4810

49.9

400KV KOZHKOD

15.567

379.476

1564

50.04

400KV NORTH TRSR

8.4026

193.0601

8.0442

5454

50.04

400KV TVM

10.953

245.419

592

50

220KV_KNPA+SBGR +PVUD+EDMN

10.7906

227.6565

9.4857

4004

50

110KV_MJSM +PRSLA

0.8535

20.2691

Net Import

88.3947

2039.3487

84.9729

Consumption

108.0452

2535.2527

105.6355

570

50.14

Deviation Account

4004

50.06

Import (mu)

0.947

34.001

1.4167

275

50.22

Export (mu)

0.161

4.22

0.1758

3945

49.94

Avg Import Rate (Rs/kWh)

Avg Export Rate (Rs/kWh)

50.22

0.52

Import amount (Rs lakhs)

49.9

0.83

Export Amount (Rslakhs)

50.03

Net Import (on UI) (mu)

0.786

29.781

1.2409

Net amount payable (Rs lakhs)

4083

220

208

CGS AVAILABILITY

40.6412

824.392

34.3497

50.05

223

209

Adl Share(-) / surrender(+)

0.8603

10.8322

0.4513

4

216

200

other open acess(+exp)

-0.5351

-10.7462

-0.4478

417

396

SR / ER Loss

1.4041

29.0178

1.2091

5533

223

211

Interstate Purch/Sale(+/-ve)

48.5692

1217.3478

50.7228

50.03

224

215

Net Schedule

87.4812

2012.0957

83.8373

22

223

213

R E C O R D S

229

219

For the month

111.7951

4279

10

5493

9

4896.9474

229

220

All time

111.7951

4279

10

5493

9

4896.9474

222

217

Cumulative figures in mu

For the month

495.904

2535.2527

61.32

2012.0957

27.253

For the Financial Year

495.904

2535.2527

61.32

2012.0957

27.253